Construction of the OLVG East hybrid ORs in Amsterdam in full swing!
Two ultramodern and future-proof hybrid operating rooms are being built in the OLVG Amsterdam (East location). Since the start of the plans – at the end of 2018 – Cleanroom Combination Group has been intensively involved in the construction team.
Already during the design phase, the design and finish of the ultramodern operating theaters were considered.
A new and innovative wall finish was chosen to match the technically sophisticated design. This wall finish gives the operating room an elegant look that suits these next level ORs. The build team consists of OLVG | EGM architecten | Royal HaskoningDHV | Deerns | MedicomZes | ULC Installatietechniek BV | Ina Roubos